The site manager was concerned that we wouldn't be able to repair this crushed gas meter box. Now it looks better than when it was installed. We love a challenging repair!
We’ve had easier repairs at 2pm on a Friday but we love a challenge! The cills had to be used because of a 12 week lead time but in under 4 hours 2 like this were repaired plus 4 others with minor damage. Cost effective and efficient.
A damaged floor or wall tile can be difficult to replace without damaging others in the process - that's assuming you even have a spare! It's much easier to contact Surface Wizard. We'll repair it in a flash.
SPECIAL DELIVERY! A delivery van hit this stone cill causing extensive damage and cracking. We repaired it and restored it to its original colour in under 4 hours.
This skirting board was damaged by a picture falling off the wall. We restored it in under 2 hours. Keep your property looking great by using Surface Wizard!
We repaired this badly damaged upvc bay window cill and made good the stone cill below. Replacement would have cost thousands and taken days. Repairs took less than half a day.
If you drop something heavy just make sure you have our contact details to hand - it'll save you money and will be repaired to the best possible condition in next to no time.
Damaged acrylic baths and shower trays can be repaired saving the time and inconvenience of replacing them. We can repair holes of any size, chips, cracks and scratches.
The wind had blown this unsecured patio door back onto the cill and caused a large hole. The owner made sure the door was secured, and we made sure it looked great.
We repaired a small chip in a quartz worktop costing thousands and saved not only that cost but all of the associated trauma in removing and replacing it.
These IPS panels in a hospital had been chipped and as well as being unsightly could have harboured germs. So we repaired and restored them to prevent any problems.
The site manager wasn't responsible for these frames but he wanted them to match the doors and windows so we resprayed them, the thresholds and meter boxes so everything matched. 6 plots, 1 man, 2 days.